Playtop Installation

Playtop is laid by trained and highly skilled installation teams, whose long experience of different site and climatic conditions ensures that surfaces are built to unvarying high standards.
Installation

Playtop Installation Sequence

Here are the main steps involved in the installation of Playtop Safer Surfacing.
Ground Excavation
Ground Excavation
Base compaction
Base compaction
Kerb cutting prior to laying
Kerb cutting prior to laying
Kerbstone perimeter installed
Kerbstone perimeter installed
Installing play equipment
Installing play equipment
Final base preparation
Final base preparation
In-fill stone foundation
In-fill stone foundation
Levelling stone foundation
Levelling stone foundation
Mixing base rubber
Mixing base rubber
Laying base rubber
Laying base rubber
Installing base rubber
Installing base rubber
Levelling base rubber
Levelling base rubber
Feature on rubber base
Feature on rubber base
Colour features installation
Colour features installation
Shaping colour feature areas
Shaping colour feature areas
Making neat edge detail
Making neat edge detail
Rolling top layer
Rolling top layer
Playtop installation complete